Project
Rathi Hospital
A G+3 hospital renovation delivered with Promaze Consultants as the Project Management Consultant. The defining challenge was that the hospital — including two operating theatres — remained fully operational throughout. Promaze planned and executed the renovation zone-by-zone and floor-by-floor, so patient care continued uninterrupted while construction progressed around it.

Gallery
Click any frame to view full-size. Swipe or use arrows to browse.
The Build
What shaped this project from foundation to handover.
Challenges
- 01
Renovating a fully functional G+3 hospital without ever shutting it down — every floor had to keep running while work was underway elsewhere.
- 02
Maintaining sterile conditions and uninterrupted operation of two active operating theatres immediately adjacent to live construction zones.
- 03
Containing dust, noise, and trade movement to protect patients, staff, and clinical hygiene across occupied areas at all times.
The Solution
Promaze broke the renovation into isolated zones and sequenced work floor-by-floor, keeping the rest of the hospital fully functional at every stage. Strict dust and infection-control barriers, scheduled around clinical activity, allowed the two OTs and all departments to operate without disruption — delivering a renovated facility with zero downtime to patient care.
Project Stakeholders
Every specialist on this build, coordinated by one team.
The agencies and professionals Promaze brought together for this project.
One accountable team,
coordinating every specialist
your project needs.
Premal Nagori (aastha Design)
Swadha Jao

